Thursday, June 3, 2010

And Unofficial work session

So I cleaned up the battery connections with the junkyard cables. It looks better and there won't be a chance of anyone mistaking the red wire that lead (past tense used here) to the negative terminal as the positive terminal. That would have been bad.

Now I need to get the battery hold down and shut off switches installed and I'll be done with this checklist item.

No comments:

Post a Comment